在此列表中
天然气

Australia's Wheatstone LNG's train 1 shut down due to electrical issue: Chevron

能源 | 液化天然气 (LNG) | 天然气 | 天然气凝液 (NGL)

Platts LP Gaswire

Energy Transition | 天然气 | Upstream | 煤炭 | 电力 | 农产品 | Chemicals | Hydrogen | 排放物 | 可再生能源 | 化肥

Costly Australian renewable hydrogen may lose upcoming supply deals to Middle East, US

液化天然气 (LNG) | 天然气 | Upstream | 原油

JGA会长表示,日本天然气公用事业公司预计,霍尔木兹海峡可能关闭将对LNG价格产生显著影响

煤炭 | 金属 | 炼焦煤 | 钢材 | 有色金属

矿业公司英美资源集团拒绝了必和必拓390亿美元的“机会主义”收购要约

金属

铁矿石指数——IODEX

Australia's Wheatstone LNG's train 1 shut down due to electrical issue: Chevron

  • 作者
  • Abache Abreu    Nathan Richardson
  • 编辑
  • Elizabeth Thang
  • 大宗商品
  • 天然气

Singapore — Production at one of the trains at Chevron's 8.9 million mt/year Wheatstone LNG facility in Western Australia has been halted due to an electrical problem, a spokeswoman for the company confirmed Friday.

尚未注册?

接收每日电子邮件提醒、订阅用户通知并获得个性化体验。

立即注册

The cause of the outage at the 4.45 million mt/year train 1 is being investigated, while train 2 continues production. No timeframe was given for when it is expected to be restarted. The facility has exported eight cargoes - or 400,000 mt of LNG - in February to date, down 24% from 526,000 mt of LNG a month earlier, according to Platts Analytics.

Wheatstone's second train began production in June last year. The first train began in October 2017. The Chevron-operated Wheatstone project is a joint venture between Australian subsidiaries of Chevron (64.14%), Kuwait Foreign Petroleum Exploration Company (13.4%), Woodside Petroleum (13%), and Kyushu Electric Power Company (1.46%), together with PE Wheatstone Pte. Ltd. part owned by JERA (8%).

-- Abache Abreu, abache.abreu@spglobal.com;

-- Nathan Richardson, newsdesk@spglobal.com

-- Edited by Elizabeth Thang, newsdesk@spglobal.com